010
1 - 3 May 2023
It is full steam ahead this week as Luke talks us through all the remaining projects that we need to complete by the end of the semester. It sounds incredibly intense but I am looking forward to learning all the skills required to achieve the desired results.
By the end of Tuesday, the chain has been twisted, rolled, and filed. An optional toggle was also completed using a couple of tiny 1.5mm wire jump rings. All that’s left for this chain is a good polish with Tripoli and Dialux bleu.
This week’s wrap up:
• Flattened chain with rolling mill
• Filed flat surface on chain by sticking it down with Thermo-Loc
• Made toggle components using 1.8mm & 1.5mm wire
• Used a small jump ring maker and pin vise